Print
Print:
Summary
Body
(YEARLY- in DECEMBER) Build (SARETMT_FALL) Calendar Dates for FALL (YYYY08)- ODD Fiscal Year
Summary
This Article is (YEARLY- in DECEMBER) Build (SARETMT_FALL) Calendar Dates for FALL (YYYY08) Ticket
Body
SYNOPSIS
DETAILS
Ticket Tags
:
Scheduling-Calendar, SARETMT; Admissions
4-tt
l People Resource
s:
Janet Mathis, Ken Eldred, Lisa Woodbury, Matthew Holmes
Build the Run Dates in
(SARETMT_FALL) Calendar
for
FALL (YYYY08)
Use the Dates in the '
Admissions Office 'Process Dates
'
document for the
FALL (YYYY08)
Dates
The
Calendar
is assigned at the Job-level to manage the
START/ STOP Run Dates
.
We use alternating FALL Calendars between the EVEN/ ODD Fiscal Years which is based on the last 2-year digits for the ODD or EVEN year.
The
SARETMT (CR, CN, CI)
Jobs
in
(ADMISSIONS_SARETMT_PROCESS)
run
DAILY
for
FALL (YYYY08):
START
:
07-DD-YYYY
STOP
:
12-DD-YYYY
This
Calendar
is built in both Automic PROD & PPRD.
*************************************
Click on the (
calendar
) icon to open the '
Calendars Selector
'
pop-up window.
In the '
Search
' field at the lower left, type in the first few letters ('sar') to jump to that section in the
Calendars
list.
Double-click on the
Calendar
named,
(SARETMT_FALL
),
or click the
(Edit)
button to open the
Calendar
.
The
(
SARETMT_FALL) Calendar
opens on the (default)
'
General
'
tab.
1. Add the
Dates
in the
(SARETMT_FALL) Calendar
for
the
FALL (YYYY08)
You'll need to add
ALL days of the week
in this
Calendar
.
Manually, click on the 1st day of each Week to select the whole week; or use the Calendar Scheduler tool to build the new dates.
DAILY:
07-15-YYYY- 12-15-YYYY
NOTE: If a day is highlighted in gray, it is already selected.
Figure 1: SARETMT_FALL Calendar (sample)
Click on both the
(Apply)(OK)
buttons to
apply/ save the changes and close the Calendar window.
2. M
ake a screen-shot of the
(SARETMT_FALL) Calendar
showing the
FALL (YYYY08)
dates.
3.
REMINDER: Update the
(SARETMT_FALL)
Calendar dates in Automic PPRD.
4. Send a Notification to the People Resources that the (SARETMT_FALL) Calendar has been built for FALL (YYYY08) which starts on JUL DD(YYYY).
****************************************
Thank you!
REFERENCES
KB Article References
1.
(
YE
ARLY- in DECEMBER
)
- Build (SARETMT_SPRING) Calendar Dates for SPRING (YYYY01)
2.
(YEARLY- in DECEMBER)
- Build (SARETMT_SUMMER) Calendar Dates for SPRING (YYYY06)
3.
(YEARLY- in DECEMBER)
- Build (SARETMT_FALL) Calendar Dates for FALL (YYYY08)
4.
(YEARLY- in DECEMBER)
- Build (SARETMT_FALL-2) Calendar Dates for FALL (YYYY08)
Document References
1.
TeamDynamix KB Articles Standards for Data Operations-v1.2.docx
2.
***************************************
Thank you!
Details
Details
Article ID:
1645
Created
Tue 12/20/22 4:53 PM
Modified
Tue 2/24/26 6:08 AM