Updating...
Skip to main content
(opens in a new tab)
Filter your search by category. Current category:
All
All
Knowledge Base
Search the client portal
Search
Sign In
Show Applications Menu
Client Portal
Sign In
Search
Home
Knowledge Base
More Applications
Skip to Knowledge Base content
Search
Articles
Blank
Knowledge Base
(YEARLY- in DECEMBER) Build (SARETMT_FALL) Calendar Dates for FALL (YYYY08)- ODD Fiscal Year
(YEARLY- in DECEMBER) Build (SARETMT_FALL) Calendar Dates for FALL (YYYY08)- ODD Fiscal Year
Tags
SARETMT
Scheduling-Calendar
Admissions
SYNOPSIS
DETAILS
Ticket Tags
:
Scheduling-Calendar, SARETMT; Admissions
4-tt
l People Resource
s:
Janet Mathis, Ken Eldred, Lisa Woodbury, Matthew Holmes
Build the Run Dates in
(SARETMT_FALL) Calendar
for
FALL (YYYY08)
Use the Dates in the '
Admissions Office 'Process Dates
'
document for the
FALL (YYYY08)
Dates
The
Calendar
is assigned at the Job-level to manage the
START/ STOP Run Dates
.
We use alternating FALL Calendars between the EVEN/ ODD Fiscal Years which is based on the last 2-year digits for the ODD or EVEN year.
The
SARETMT (CR, CN, CI)
Jobs
in
(ADMISSIONS_SARETMT_PROCESS)
run
DAILY
for
FALL (YYYY08):
START
:
07-DD-YYYY
STOP
:
12-DD-YYYY
This
Calendar
is built in both Automic PROD & PPRD.
*************************************
Click on the (
calendar
) icon to open the '
Calendars Selector
'
pop-up window.
In the '
Search
' field at the lower left, type in the first few letters ('sar') to jump to that section in the
Calendars
list.
Double-click on the
Calendar
named,
(SARETMT_FALL
),
or click the
(Edit)
button to open the
Calendar
.
The
(
SARETMT_FALL) Calendar
opens on the (default)
'
General
'
tab.
1. Add the
Dates
in the
(SARETMT_FALL) Calendar
for
the
FALL (YYYY08)
You'll need to add
ALL days of the week
in this
Calendar
.
Manually, click on the 1st day of each Week to select the whole week; or use the Calendar Scheduler tool to build the new dates.
DAILY:
07-15-YYYY- 12-15-YYYY
NOTE: If a day is highlighted in gray, it is already selected.
Figure 1: SARETMT_FALL Calendar (sample)
Click on both the
(Apply)(OK)
buttons to
apply/ save the changes and close the Calendar window.
2. M
ake a screen-shot of the
(SARETMT_FALL) Calendar
showing the
FALL (YYYY08)
dates.
3.
REMINDER: Update the
(SARETMT_FALL)
Calendar dates in Automic PPRD.
4. Send a Notification to the People Resources that the (SARETMT_FALL) Calendar has been built for FALL (YYYY08) which starts on JUL DD(YYYY).
****************************************
Thank you!
REFERENCES
KB Article References
1.
(
YE
ARLY- in DECEMBER
)
- Build (SARETMT_SPRING) Calendar Dates for SPRING (YYYY01)
2.
(YEARLY- in DECEMBER)
- Build (SARETMT_SUMMER) Calendar Dates for SPRING (YYYY06)
3.
(YEARLY- in DECEMBER)
- Build (SARETMT_FALL) Calendar Dates for FALL (YYYY08)
4.
(YEARLY- in DECEMBER)
- Build (SARETMT_FALL-2) Calendar Dates for FALL (YYYY08)
Document References
1.
TeamDynamix KB Articles Standards for Data Operations-v1.2.docx
2.
***************************************
Thank you!
Sign in to leave feedback
100% helpful - 1 review
Blank
Blank
Blank
Blank
Print Article
Deleting...